Hows it going?
I have no idea whats happend but all of a sudden the blue lines that go round the edges of holes and show the outline of each end has gone! Ive tryed changing the colour and still nothing!
Cheers
Thom Davies
Search found 377 matches
- Sun, Aug 08 2010, 5:28PM
- Forum: eCabinet Systems Software
- Topic: Lines Have Gone!
- Replies: 2
- Views: 2719
- Thu, Jul 29 2010, 4:01PM
- Forum: Thermwood 3-Axis Machinery
- Topic: Speeding Up Sheet Times
- Replies: 7
- Views: 5555
Re: Speeding Up Sheet Times
Hey Ryan
Where do i go to turn off the M48 command and put in M49?
Cant i just up the feed speeds to go to say 1195IPM instead of putting in the M49?
Also are you saying i can have the drill bank @ 25000 plunge? If so that would b wicked!
Where do i go to turn off the M48 command and put in M49?
Cant i just up the feed speeds to go to say 1195IPM instead of putting in the M49?
Also are you saying i can have the drill bank @ 25000 plunge? If so that would b wicked!
- Wed, Jul 28 2010, 2:38PM
- Forum: Thermwood 3-Axis Machinery
- Topic: Speeding Up Sheet Times
- Replies: 7
- Views: 5555
Speeding Up Sheet Times
Hows it going? Im about to start a 1000 + Sheet job and want to speed up certain areas of the cutting process. Mostly the drill bank, I would like to know what the max plunge speed is and how i can speed it up darting around the sheet. At the moment the drill bank is set to about 5000 plunge speed. ...
- Tue, Jul 20 2010, 8:03PM
- Forum: Thermwood 3-Axis Machinery
- Topic: manually rearrange the optimiser pattern
- Replies: 14
- Views: 8710
Re: manually rearrange the optimiser pattern
Its werid seeing Kerry and dan post in the cnc forum part! lol
- Tue, Jun 29 2010, 11:32PM
- Forum: Lounge
- Topic: V6 1 Month on..
- Replies: 0
- Views: 3496
V6 1 Month on..
Hey Guys
All i can say is i couldnt be happier with it! I helled out till the very last day to switch over and with 1 month under my belt ive only come across 1 little bug witch is nothing really!
So big thanks to thermwood for this amazing program!
Cheers
Thom Davies
All i can say is i couldnt be happier with it! I helled out till the very last day to switch over and with 1 month under my belt ive only come across 1 little bug witch is nothing really!
So big thanks to thermwood for this amazing program!
Cheers
Thom Davies
- Wed, Jun 23 2010, 3:26PM
- Forum: Lounge
- Topic: Happy Birthday Kerry!
- Replies: 14
- Views: 15236
Happy Birthday Kerry!
Hey Kerry!
Hope you have a great day!
Hope you have a great day!
- Sun, May 02 2010, 4:59PM
- Forum: eCabinet Systems Software
- Topic: 5.2 Build 8?
- Replies: 2
- Views: 4382
5.2 Build 8?
Hey Hows it going?
Just wondering if there going to be another time extenion on 5.2? Cos im very happy with it @ the mo!
Cheers
Thom Davies
Just wondering if there going to be another time extenion on 5.2? Cos im very happy with it @ the mo!
Cheers
Thom Davies
- Wed, Apr 28 2010, 10:55PM
- Forum: eCabinet Systems Software
- Topic: Control software V5.58
- Replies: 5
- Views: 6088
Re: Control software V5.58
5.58 Works fine for me.
But you can always revert back to older v by going to repair option
But you can always revert back to older v by going to repair option
- Wed, Mar 31 2010, 3:07PM
- Forum: Thermwood 3-Axis Machinery
- Topic: WE NEED D PASS OFF!
- Replies: 4
- Views: 3671
Re: WE NEED D PASS OFF!
Man im a douchebag!
sorry guys. i started @ 6am and was rushing to get this job done and for sum reason i was thinking to increase the area! lol
Sorry again!
Wot a douche!
sorry guys. i started @ 6am and was rushing to get this job done and for sum reason i was thinking to increase the area! lol
Sorry again!
Wot a douche!
- Wed, Mar 31 2010, 1:04PM
- Forum: Thermwood 3-Axis Machinery
- Topic: WE NEED D PASS OFF!
- Replies: 4
- Views: 3671
WE NEED D PASS OFF!
Hows it going?
Ive tried everything to get the RN to stop double passing and it still does it! I've gone back to 5.51 and made my double pass size big real big! 1000000000 or so. and still it double passes!
Please help! this is slowing us down big time!
.
Cheers
Thom Davies
Ive tried everything to get the RN to stop double passing and it still does it! I've gone back to 5.51 and made my double pass size big real big! 1000000000 or so. and still it double passes!
Please help! this is slowing us down big time!
.
Cheers
Thom Davies
- Wed, Mar 24 2010, 8:06PM
- Forum: Lounge
- Topic: NZ Joiner Magazine
- Replies: 10
- Views: 14091
Re: NZ Joiner Magazine
I thought the company Akela was the seller for auzzie and NZ?
- Wed, Mar 24 2010, 5:22PM
- Forum: Lounge
- Topic: NZ Joiner Magazine
- Replies: 10
- Views: 14091
Re: NZ Joiner Magazine
Yep it sure is!
- Wed, Mar 24 2010, 2:08PM
- Forum: Lounge
- Topic: NZ Joiner Magazine
- Replies: 10
- Views: 14091
Re: NZ Joiner Magazine
I put this up to tell thermwood usa that there was these stories in the nz joiner mag.
I am wondering why the people in auzzie didn't put a ad in or storie.
I am wondering why the people in auzzie didn't put a ad in or storie.
- Tue, Mar 23 2010, 11:05PM
- Forum: Lounge
- Topic: NZ Joiner Magazine
- Replies: 10
- Views: 14091
NZ Joiner Magazine
How's it going?
I just got the lastest nz joiner mag and they had all about nesting machines and nesting programs!
Was very disapointed not to see any thermwoods or ecabinets listed in it!
We need more thermwoods and ecabinets in NZ!
Cheers
Thom Davies
I just got the lastest nz joiner mag and they had all about nesting machines and nesting programs!
Was very disapointed not to see any thermwoods or ecabinets listed in it!
We need more thermwoods and ecabinets in NZ!
Cheers
Thom Davies
- Thu, Mar 18 2010, 3:36PM
- Forum: eCabinet Systems Software
- Topic: Let's give Thermwood some well deserved credit!
- Replies: 21
- Views: 16482