Hello all,
I have a rather large kitchen job that is running painfully slow. I would like some opinions from others on how it runs on your systems before I consider purchasing a new system. My average size jobs do not run like this. Mys system specs. are shown below. Ram is now 16GB not 4
Load times between editors will be helpful and what systems you are using to run it. Link to the public dropbox file is below.
Thanks
https://dl.dropboxusercontent.com/u/313 ... 0Doors.esj
Large Job Running Painfully Slow_Need Advice
Moderators: Jason Susnjara, Larry Epplin, Clint Buechlein, Scott G Vaal
-
- Senior Member
- Posts: 137
- Joined: Sat, Jun 11 2005, 7:18AM
- Location: Rock Hill, N.Y.
- Contact:
Large Job Running Painfully Slow_Need Advice
Dell Precision M4800
Intel(r) core(tm) i7-4800mq cpu @ 2.70ghz
32 GB RAM
NVIDIA Quadro K 2100M
Windows 8.1 Professional 64-bit
Intel(r) core(tm) i7-4800mq cpu @ 2.70ghz
32 GB RAM
NVIDIA Quadro K 2100M
Windows 8.1 Professional 64-bit
-
- Thermwood Team
- Posts: 857
- Joined: Tue, May 17 2005, 12:47PM
- Company Name: Thermwood
- Country: UNITED STATES
- Location: Thermwood
Re: Large Job Running Painfully Slow_Need Advice
What are the main areas/functions that you noticing slowness with this job?
Rick Deskins
eCabinet Systems Programmer
Dell Precision / Xeon E3-1240 / 8GB RAM/ AMD FirePro V4900
eCabinet Systems Programmer
Dell Precision / Xeon E3-1240 / 8GB RAM/ AMD FirePro V4900
-
- Senior Member
- Posts: 137
- Joined: Sat, Jun 11 2005, 7:18AM
- Location: Rock Hill, N.Y.
- Contact:
Re: Large Job Running Painfully Slow_Need Advice
Pretty much all areas of the job.
I am not as concerned about how long renderings take though as I am in the working areas, such as time to go from editor to editor and so forth.
I am not as concerned about how long renderings take though as I am in the working areas, such as time to go from editor to editor and so forth.
Dell Precision M4800
Intel(r) core(tm) i7-4800mq cpu @ 2.70ghz
32 GB RAM
NVIDIA Quadro K 2100M
Windows 8.1 Professional 64-bit
Intel(r) core(tm) i7-4800mq cpu @ 2.70ghz
32 GB RAM
NVIDIA Quadro K 2100M
Windows 8.1 Professional 64-bit
-
- Guru Member
- Posts: 833
- Joined: Thu, May 14 2009, 11:41PM
- Company Name: Diamond Lake Custom Woodworks
- Location: Newport, WA
- Contact:
Re: Large Job Running Painfully Slow_Need Advice
I have noticed this same behavior in larger jobs. Going from room layout to CE takes a long time. Then moving between the different editors takes a long time. I have noticed a lot of regeneration of all parts of a cabinet even if I made no changes in an editor. The slowest is cabinets that have a multiple drawer boxes. Long time to regenerate these cabinets. Going from CE to room layout takes a real long time. I've gotten the point that I have Solitaire running so I can switch and play some cards while waiting. Same thing when Saving a large job. Click the save icon and go play Solitaire.
Not sure what can be done to optimize regeneration when things aren't changed, but I know things would really speed up with some more intelligence put into those algorithms. I know it's tough and time consuming. Just my two cents. I was a computer programmer for 18 years (EDS, Microsoft and my own software company).
Not sure what can be done to optimize regeneration when things aren't changed, but I know things would really speed up with some more intelligence put into those algorithms. I know it's tough and time consuming. Just my two cents. I was a computer programmer for 18 years (EDS, Microsoft and my own software company).
Sincerely,
Don Thomson
Diamond Lake Custom Woodworks, LLC
509-671-6230
Newport, WA
http://www.dlwoodworks.com
Don Thomson
Diamond Lake Custom Woodworks, LLC
509-671-6230
Newport, WA
http://www.dlwoodworks.com