Postby David Hall » Tue, Nov 15 2005, 8:23AM

Prior to 4.79, DXF files run through rolling nest used to always drill first. Now even after putting a 1 after the drill layer name (drill1 z0p76) and a 2 after the dado layer name (dado2 z0p376) the dado is cut first. This is causing huge problems for some of our designs where we drill pilot holes that are bisected by a blind dado.

The 1/8\" bit just snaps off when you try to drill on the edge of a dado.

Please fix this.

Can I revert to an earlier RN version by installing the update?

Regards,
Dave
Attachments
finished left end back.zip
(990 Bytes) Downloaded 113 times
David Hall
Hall's Edge Inc.
eCabinets Machining Services
http://www.HallsEdge.com

User avatar
Josh Meyer
Thermwood Team
Posts: 23
Joined: Tue, May 17 2005, 1:39PM
Location: Thermwood

Postby Josh Meyer » Tue, Nov 15 2005, 8:53AM

Dave,
I have seen the issue you are referring to with the dado opertions being machined before the drill operations and we are currently looking into a fix for the problem. I will let you know as soon as it is finished.
Sincerely,
Josh Meyer

User avatar
Josh Meyer
Thermwood Team
Posts: 23
Joined: Tue, May 17 2005, 1:39PM
Location: Thermwood

Postby Josh Meyer » Tue, Nov 15 2005, 9:03AM

Dave
The issue with not being able to force the dado layer geometry to be machined first has been solved. You will be able to append the operation order number to each layer to control the order that it is cut. The update for Version 4.81 should be available vie the THM website momentarily.
Sincerely,

Josh Meyer

Dave Burtchell
Junior Member
Posts: 98
Joined: Thu, Jun 30 2005, 10:04PM

Postby Dave Burtchell » Tue, Nov 15 2005, 5:21PM

Josh,

We're running 4.79 I've noticed that the tools I have set up for 1st and 2nd operations in tooling are cutting in reverse order. both are set for dado only, not drill. Is this related to the problem Dave's having?


Thanks,
Dave

David Hall
eCabinets Beta Tester
Posts: 588
Joined: Tue, May 17 2005, 12:41PM
Location: Stamford, CT USA
Contact:

Postby David Hall » Tue, Nov 15 2005, 8:59PM

OK, that got me through today. If I specify drill layer as Drill1 and the dado layer as dado2, for all parts on the sheet. It does the drilling first.
Drill1 and dado2 on just one part on the sheet doesn't work. (at least when the part is part2)

Can we put the default order of operations back the way it was? Pleeease.

I have standing files that must now be reworked for no good reason. I like the new features that let me control the order of operations. This is a powerful addition that let's us do more with DXF files than ever before. BUT, the new default order is causing major headaches. This is broken.

Thanks for the quick work.

Regards,
Dave
David Hall

Hall's Edge Inc.

eCabinets Machining Services

http://www.HallsEdge.com

User avatar
Josh Meyer
Thermwood Team
Posts: 23
Joined: Tue, May 17 2005, 1:39PM
Location: Thermwood

Postby Josh Meyer » Wed, Nov 16 2005, 9:40AM

Dave,
There will be an option added to the settings dialog in the Control Nesting software to give you that ability. It will be availble on the website as soon as it it finished.
Sincerely,