Hi, can someone explian the new double pass dialog box and the new max penetration dialog box in tooling as there has not been a manual update
thank Stephen
Double pass / Max penetration ?
Moderators: Jason Susnjara, Larry Epplin, Clint Buechlein, Jim Bullis
-
- Junior Member
- Posts: 85
- Joined: Thu, Aug 16 2007, 4:20AM
- Location: County Durham, United Kingdom
-
- Thermwood Team
- Posts: 361
- Joined: Wed, May 17 2006, 11:25AM
- Location: Thermwood
Re: Double pass / Max penetration ?
Stephen,
The Double Pass dialog allows the operator to set a maximum square inch or millimeter setting as well as a maximum width/length value for skinny parts. Any part that falls below either setting will get a Double Pass operation on the outline. The outline tool will cut down to the Skin Thickness on the first pass.
If you wish to have parts not get the skin remove the "Size to Leave Skin on Double Pass Part" is provided. Any part that falls below either the Size or Width/Length setting will have the skin left on.
The "Max Penetration" setting keeps a tool from being used at a depth greater than this amount in 1 pass. If a depth of cut is greater than this amount Control Nesting will perform the operation in incremental passes at the "Max Penetration" amount until the operation is complete.
The Double Pass dialog allows the operator to set a maximum square inch or millimeter setting as well as a maximum width/length value for skinny parts. Any part that falls below either setting will get a Double Pass operation on the outline. The outline tool will cut down to the Skin Thickness on the first pass.
If you wish to have parts not get the skin remove the "Size to Leave Skin on Double Pass Part" is provided. Any part that falls below either the Size or Width/Length setting will have the skin left on.
The "Max Penetration" setting keeps a tool from being used at a depth greater than this amount in 1 pass. If a depth of cut is greater than this amount Control Nesting will perform the operation in incremental passes at the "Max Penetration" amount until the operation is complete.
-
- Junior Member
- Posts: 98
- Joined: Thu, Jun 30 2005, 10:04PM
Re: Double pass / Max penetration ?
When I read about max penetration in the CN update page, it didn't say anything about making incremental passes until full depth is reached. This is just what we need to cut our 8/4 solid parts in 1/2" passes. Thanks for the explanation here.Daniel Vonderheide wrote:Stephen,
The "Max Penetration" setting keeps a tool from being used at a depth greater than this amount in 1 pass. If a depth of cut is greater than this amount Control Nesting will perform the operation in incremental passes at the "Max Penetration" amount until the operation is complete.
Dave
-
- Thermwood Team
- Posts: 361
- Joined: Wed, May 17 2006, 11:25AM
- Location: Thermwood
Re: Double pass / Max penetration ?
All of the information was taken from the updated manual. If you open control nesting and then click on the blue box with the question mark, you will be looking at the updated manual.
-
- eCabinets Beta Tester
- Posts: 933
- Joined: Tue, May 17 2005, 2:48PM
- Location: Logansport, In
- Contact:
Re: Double pass / Max penetration ?
Ha, should have read this post 30 minutes ago, right Daniel!
Mike Murray
Versatile Cabinet & Solid Surface
mike@versatilecabinet.com
http://www.versatilecabinet.com
Versatile Cabinet & Solid Surface
mike@versatilecabinet.com
http://www.versatilecabinet.com