New Build?
Moderators: Jason Susnjara, Larry Epplin, Clint Buechlein, Scott G Vaal
-
- Wizard Member
- Posts: 4722
- Joined: Mon, May 09 2005, 7:33PM
- Company Name: Double E Cabinets
- Country: UNITED STATES
- Location: Amarillo, TX
New Build?
OK, I just have to ask.
Any idea when the new build with the ability to add slide mount holes to backs will be out?
I think Scott swore it would be released by last Christmas. Sure would like to build a CNC Cabinet Library but can't start until this feature is added.
By the way my birthday is just around the corner.
Kerry
Any idea when the new build with the ability to add slide mount holes to backs will be out?
I think Scott swore it would be released by last Christmas. Sure would like to build a CNC Cabinet Library but can't start until this feature is added.
By the way my birthday is just around the corner.
Kerry
-
- Guru Member
- Posts: 622
- Joined: Fri, May 20 2005, 6:48PM
- Company Name: Classic Cabinetry
- Location: Albany Western Australia
- Contact:
Re: New Build?
Yeah count me in on that. I'd like to swear at the new build like Scott does. Bring it on. Scott seams to have trouble with time. Maybe he is a time lord and flicks around from from one time period to another. Dr Who's cousin. Regards Neville
Neville Australia
-
- Senior Member
- Posts: 249
- Joined: Wed, Dec 10 2008, 3:29PM
- Company Name: Eastcoast Ultimate
- Country: AUSTRALIA
- Contact:
Re: New Build?
Oh you mean the build with the ability to add holes to the backs of draw fronts for metal clips. And manually change hinge hole positions. Yeah I can't wait for that. Certainly it must be soon. It's been a long time since updates so surely this must be the reason why.
Core i7-2600 @ 3.70Ghz - 8 GB ram - Win 7 Ultimate 64bit - 2 x 24" ASUS monitors - Nvidia 600 Quadro 1GB graphics
www.eastcoastultimate.com.au
www.eastcoastultimate.com.au
-
- eCabinets Beta Tester
- Posts: 933
- Joined: Tue, May 17 2005, 2:48PM
- Location: Logansport, In
- Contact:
Re: New Build?
You mean the one with print to scale capabilities and pilot holes in the dados?????
Seriously, we should be happy that THM is still available for support, does any one else get the auction notices from IRS auctions...
Major players packing it in everyday.........
Seriously, we should be happy that THM is still available for support, does any one else get the auction notices from IRS auctions...
Major players packing it in everyday.........
Mike Murray
Versatile Cabinet & Solid Surface
mike@versatilecabinet.com
http://www.versatilecabinet.com
Versatile Cabinet & Solid Surface
mike@versatilecabinet.com
http://www.versatilecabinet.com
-
- Guru Member
- Posts: 622
- Joined: Fri, May 20 2005, 6:48PM
- Company Name: Classic Cabinetry
- Location: Albany Western Australia
- Contact:
Re: New Build?
Hey Kerry,
What have you done to Thermwood. No one at Thermwood has responded to your post.
Have you said something mean to Jason? You better whip up a Texas speciality cake and send it over to the office?
Apart from that, hope all is going well and you have that Thermwood humming away.
Regards
Neville
What have you done to Thermwood. No one at Thermwood has responded to your post.
Have you said something mean to Jason? You better whip up a Texas speciality cake and send it over to the office?
Apart from that, hope all is going well and you have that Thermwood humming away.
Regards
Neville
Neville Australia
-
- Guru Member
- Posts: 510
- Joined: Thu, Jun 16 2005, 7:53PM
- Location: Sydney Aust
Re: New Build?
I saw this in the blog back in April http://blog.thermwood.com/bid/59997/A-R ... d#Comments Perhaps not the drawer problem solved but it seems like the guys are working on some new features which will be available in the next build of eCabinets.
-
- Guru Member
- Posts: 622
- Joined: Fri, May 20 2005, 6:48PM
- Company Name: Classic Cabinetry
- Location: Albany Western Australia
- Contact:
Re: New Build?
Had a email from Thermwood today with a sneak preview of AWFS. One item was the new joint to be previewed. Does this mean a new build is to be released? Is the new joint the only feature of the new build?
Hopefully someone at Thermwood will reply?
Regards
Neville
Hopefully someone at Thermwood will reply?
Regards
Neville
Neville Australia
-
- Senior Member
- Posts: 249
- Joined: Wed, Dec 10 2008, 3:29PM
- Company Name: Eastcoast Ultimate
- Country: AUSTRALIA
- Contact:
Re: New Build?
Well its nice to see they are adding new construction methods, although I'm not sure any request has been made for it through these forums? I woulld really hope they've been sorting out items that have been rquested though...
Core i7-2600 @ 3.70Ghz - 8 GB ram - Win 7 Ultimate 64bit - 2 x 24" ASUS monitors - Nvidia 600 Quadro 1GB graphics
www.eastcoastultimate.com.au
www.eastcoastultimate.com.au
-
- Wizard Member
- Posts: 4722
- Joined: Mon, May 09 2005, 7:33PM
- Company Name: Double E Cabinets
- Country: UNITED STATES
- Location: Amarillo, TX
-
- Senior Member
- Posts: 249
- Joined: Wed, Dec 10 2008, 3:29PM
- Company Name: Eastcoast Ultimate
- Country: AUSTRALIA
- Contact:
Re: New Build?
My requests/whinges were made before that though It is a nice feature, though, I'm sure we will use it.
Core i7-2600 @ 3.70Ghz - 8 GB ram - Win 7 Ultimate 64bit - 2 x 24" ASUS monitors - Nvidia 600 Quadro 1GB graphics
www.eastcoastultimate.com.au
www.eastcoastultimate.com.au
-
- Wizard Member
- Posts: 4722
- Joined: Mon, May 09 2005, 7:33PM
- Company Name: Double E Cabinets
- Country: UNITED STATES
- Location: Amarillo, TX
Re: New Build?
Jason,
I want to use the new joinery also.
Hey Scott, Tuesday would be a good day to release the new build.
I want to use the new joinery also.
Hey Scott, Tuesday would be a good day to release the new build.
-
- Guru Member
- Posts: 622
- Joined: Fri, May 20 2005, 6:48PM
- Company Name: Classic Cabinetry
- Location: Albany Western Australia
- Contact:
Re: New Build?
Hell yeah baby.. Its Tuesday morning already for me and Jason. Roll it on
Neville Australia
-
- Wizard Member
- Posts: 4722
- Joined: Mon, May 09 2005, 7:33PM
- Company Name: Double E Cabinets
- Country: UNITED STATES
- Location: Amarillo, TX
Re: New Build?
Neville,
If you get a copy email it to me so I can have it on Monday a day before you get it on Tuesday.
I need to know what is in Build 7 so I can start a wish list for build 8.
If you get a copy email it to me so I can have it on Monday a day before you get it on Tuesday.
I need to know what is in Build 7 so I can start a wish list for build 8.
-
- Thermwood Team
- Posts: 1721
- Joined: Tue, May 10 2005, 1:26PM
- Location: Thermwood
- Contact:
Re: New Build?
Hi Everyone,
I sent out a mass email late last week to all eCabinet members stating that we will be showing the Lock Dado Joint at the upcoming AWFS show in Las Vegas. Unfortunately, I jumped the gun and the new joint is not ready along with some of the other added features in eCabinet Systems. I also don't have a time when the new update will be available either.
Again, sorry for the confusion and I hope to see some of you at the AWFS show.
thanks,
I sent out a mass email late last week to all eCabinet members stating that we will be showing the Lock Dado Joint at the upcoming AWFS show in Las Vegas. Unfortunately, I jumped the gun and the new joint is not ready along with some of the other added features in eCabinet Systems. I also don't have a time when the new update will be available either.
Again, sorry for the confusion and I hope to see some of you at the AWFS show.
thanks,
Jason Susnjara
V.P., Marketing
Thermwood Corp.
On YouTube:
http://www.youtube.com/ThermwoodCNC
Thermwood Blog:
http://blog.thermwood.com
V.P., Marketing
Thermwood Corp.
On YouTube:
http://www.youtube.com/ThermwoodCNC
Thermwood Blog:
http://blog.thermwood.com
-
- Guru Member
- Posts: 622
- Joined: Fri, May 20 2005, 6:48PM
- Company Name: Classic Cabinetry
- Location: Albany Western Australia
- Contact:
Re: New Build?
Kerry you always do this to me. Make me think I'm getting something on a Tuesday then it doesn't happen.
Back to cursing the computer
Regards
Neville
Back to cursing the computer
Regards
Neville
Neville Australia