loaded up a group of 3 ecabinet jobs into one cut batch, as i always do. turned off a few parts from each job, so as to only nest the white melamine parts (3/4\", 5/8\", and 1/2\"). Now here is the problem:
-all of the parts (so far as i can tell) for job 1 loaded and nested properly
-all of the parts (so far as i can tell) for job 3 loaded and nexted properly
-all of the 1/2\" and 5/8\" (backs and shelves) parts for job 2 loaded and nested properly, but only the 3/4\" parts for the first 2 cabinets in the list nested.
i didn't even realize the problem until i was well into the job and only had 7 parts total for job 2.
any hints as to why/how this could have happened? makes me kinda worried that the guys down the line are going to be missing parts to other jobs. i triple checked to make sure that i hadn't turned off the other parts. and that wouldn't explain why all the backs and shelves nested fine. i have gone back and re-loaded job 2 and all the parts appear to have loaded and nested properly this time.
I
ve not seen this problem. Can you send me the job in question to program@thermwood.com. I'll have a look at it. Also give me step by step of what you turned off. I'll try to reproduce it, but it may be tough.
I wish I could say that I found something, but I can't. I took your job and nested it several times and had the exact same part count each time. Unless some fat fingering happened I'm not sure what to say.