Is there a way to load multiple batch jobs into ecabs to create a single TWD file? Same kinda idea as creating an assembly out of mulitple cabinets, I want to create an \"assembly\" of batch jobs before writing the TWD file.
This way, it would make it easier to see exactly how many sheets of material I am going to need for certain runs, since we almost never load up just a single batch job to run at a time. It also means that the guy at the machine only has to find and load one file instead of multiples.
Just looking for a way to speed things up as much as I possibly can... schedule keeps getting tighter and tighter.
loading multiple batches
Moderators: Jason Susnjara, Larry Epplin, Clint Buechlein, Scott G Vaal, Jason Susnjara, Larry Epplin, Clint Buechlein, Scott G Vaal
-
- Guru Member
- Posts: 366
- Joined: Fri, Aug 25 2006, 9:12AM
- Company Name: Paris Kitchens
- Country: CANADA
- Location: Paris, ontario
-
- Senior Member
- Posts: 171
- Joined: Tue, Jun 21 2005, 3:23PM
- Location: Connellsville, PA
-
- Guru Member
- Posts: 366
- Joined: Fri, Aug 25 2006, 9:12AM
- Company Name: Paris Kitchens
- Country: CANADA
- Location: Paris, ontario