Free Planning Tool

Model 43 Work Cell Savings Calculator

Every minute spent labeling, unloading and reloading is a minute your router isn't cutting. And every extra person at the table adds to the cost of each sheet.

Enter your shop's numbers, then see the same work run on a one-operator Model 43 Work Cell.

Thermwood Model 43 Work Cell CNC router with remote operator station and powered out-feed conveyor
Model 43 Work Cell 5'x10'
Process Detail - Your Current Shop
people
People running your machine today
min
Estimated time to cut one sheet
Do you label?
min
Labeling time after each sheet
Not included in your results
min
Unloading parts, cleaning off the table and loading a new sheet (1.5 min minimum)
Your cycle time per sheet14.5 min
Operating variables
Per person. Include benefits and payroll taxes if you know them.
hours
days

Nothing to enter here. These are the Work Cell's numbers, using your times from step 1.

Process Detail - With a Model 43 Work Cell
Manpower per machine1 personThe Work Cell is built for one operator
Program cycle time5.5 minThe time you entered in step 1A Model 43 often cuts faster, which would add to your savings. This estimate doesn't count that.
Labeling and unloadingUnloadingDuring the next cutDone at the out-feed conveyor while the next sheet cuts
Time between sheets65 sec
  • 20 sec for the off-load rake to move parts onto the conveyor and clean off the table
  • 45 sec to load the next sheet
Work Cell cycle time per sheet6.6 min
Operating variables
Average hourly rate$25.25The rate you entered in step 1
Production hours per day8.0 hoursThe hours you entered in step 1
Your Savings with a Model 43 Work Cell
Example shop
Estimated savings per sheet
$9.43
Down from $12.20 to $2.77 per sheet
About $78,041 a year based on your current 33.1 sheets a day, 250 days a year
Extra capacity per day
+39.8 sheets
Labor freed up per day
$202
1 person freed up for other work
Side-by-Side Comparison
TodayWork Cell
Manpower per machine21
Cycle time per sheet14.5 min6.6 min
Sheets per day33.172.9
Daily manpower cost$404$202
Cost per sheet$12.20$2.77

How these numbers work

  • Cost per sheet is your daily manpower cost divided by the sheets you can run in a day.
  • The Work Cell uses one operator and your program cycle time. Many shops cut faster on a Model 43, which isn't counted here.
  • Between sheets, the Work Cell stops for an average of 65 seconds to clear and clean the table and load the next sheet.
  • We assume your Work Cell operator can label and unloadunload the last sheet's parts at the out-feed conveyor within the next sheet's program cycle time. If it takes longer, the router waits and your savings will be lower.

Results are estimates for planning only. Actual results depend on your parts, materials, tooling and workflow.

Example shop savings per sheet $9.43

Where the Savings Come From

One operator instead of a crew

The Work Cell is laid out so a single person can load, label and offload while the router keeps cutting.

Less idle time between sheets

A full-table off-load rake with built-in dust collection moves finished parts onto a powered out-feed conveyor and cleans off the table in the same pass, so the next sheet goes on faster.

Labels in the sheet layout

Labels print automatically, and the operator applies them at the conveyor while the next sheet is cutting.

Optional material handling

Adds an optional manual lift system and next sheet locator light that shows the operator which stack to pull from.

Work Cell Savings Calculator Questions

How does the Thermwood Model 43 Work Cell lower cost per sheet?

The Model 43 Work Cell is built for one operator instead of a crew. A full-table off-load rake with built-in dust collection moves cut parts onto a powered out-feed conveyor and cleans off the table in the same pass. The operator labels and unloads the parts at the conveyor while the next sheet cuts. The machine only waits about 65 seconds between sheets: about 20 seconds for the off-load rake to clear and clean the table, and about 45 seconds to load the next sheet.

How does the calculator figure cost per sheet?

Cost per sheet is your daily manpower cost divided by the sheets you can run in a day. Daily manpower cost is your average hourly rate times the number of people times your production hours. Sheets per day is your production minutes divided by your cycle time per sheet.

What counts toward cycle time per sheet?

For your current process, cycle time is your program cycle time plus any labeling time after the program finishes plus your time to unload parts, clean off the table and load the next sheet. On a Model 43 Work Cell, cycle time is your program cycle time plus about 65 seconds, because labeling and unloading happen at the out-feed conveyor while the next sheet cuts.

Does the estimate include faster cutting on the Model 43?

No. The calculator uses the same program cycle time for your current process and for the Work Cell, so the savings shown come from running with one operator and from labeling and unloading while the next sheet cuts. Many shops also cut faster on a Model 43, which would add to these savings, but it depends on your parts, materials and tooling, so it isn't included.

What if my shop doesn't label parts?

Choose “No” next to “Do you label?” and the calculator leaves labeling out of both your current process and the Work Cell. Your savings then come from running with one operator and from the shorter time between sheets.

What does the example shop in the calculator show?

The example shop runs 2 people per machine with a 5.5-minute program cycle time, 4 minutes of labeling, 5 minutes to unload and load, an average rate of $25.25 an hour and 8 production hours a day. With a Model 43 Work Cell, its cost per sheet drops from $12.20 to $2.77, a savings of $9.43 per sheet, or about $78,000 a year based on its current 33.1 sheets a day, 250 days a year. The Work Cell can also run about 72.9 sheets a day in the same hours.

What comes with the Thermwood Model 43 Work Cell?

The Model 43 Work Cell is a complete nested-based CNC routing system on a 5'x10' table. It includes a 12 HP HSD spindle, a 21-position automatic tool changer, a full-table off-load rake with integrated dust collection, a powered 61"x144" out-feed conveyor and a remote operator station with a monitor and label printer. Options include a manual lift system and a next sheet locator light that shows the operator which stack to pull from.

Learn more about the Thermwood Model 43 and Model 43 Work Cell.