Every minute spent labeling, unloading and reloading is a minute your router isn't cutting. And every extra person at the table adds to the cost of each sheet.
Enter your shop's numbers, then see the same work run on a one-operator Model 43 Work Cell.
Nothing to enter here. These are the Work Cell's numbers, using your times from step 1.
| Today | Work Cell | |
|---|---|---|
| Manpower per machine | 2 | 1 |
| Cycle time per sheet | 14.5 min | 6.6 min |
| Sheets per day | 33.1 | 72.9 |
| Daily manpower cost | $404 | $202 |
| Cost per sheet | $12.20 | $2.77 |
How these numbers work
Results are estimates for planning only. Actual results depend on your parts, materials, tooling and workflow.
Enter your details, and your PDF will download right away.
Loading the form...
Prefer to talk? Call 1-800-533-6901 or email sales@thermwood.com.
The Work Cell is laid out so a single person can load, label and offload while the router keeps cutting.
A full-table off-load rake with built-in dust collection moves finished parts onto a powered out-feed conveyor and cleans off the table in the same pass, so the next sheet goes on faster.
Labels print automatically, and the operator applies them at the conveyor while the next sheet is cutting.
Adds an optional manual lift system and next sheet locator light that shows the operator which stack to pull from.
The Model 43 Work Cell is built for one operator instead of a crew. A full-table off-load rake with built-in dust collection moves cut parts onto a powered out-feed conveyor and cleans off the table in the same pass. The operator labels and unloads the parts at the conveyor while the next sheet cuts. The machine only waits about 65 seconds between sheets: about 20 seconds for the off-load rake to clear and clean the table, and about 45 seconds to load the next sheet.
Cost per sheet is your daily manpower cost divided by the sheets you can run in a day. Daily manpower cost is your average hourly rate times the number of people times your production hours. Sheets per day is your production minutes divided by your cycle time per sheet.
For your current process, cycle time is your program cycle time plus any labeling time after the program finishes plus your time to unload parts, clean off the table and load the next sheet. On a Model 43 Work Cell, cycle time is your program cycle time plus about 65 seconds, because labeling and unloading happen at the out-feed conveyor while the next sheet cuts.
No. The calculator uses the same program cycle time for your current process and for the Work Cell, so the savings shown come from running with one operator and from labeling and unloading while the next sheet cuts. Many shops also cut faster on a Model 43, which would add to these savings, but it depends on your parts, materials and tooling, so it isn't included.
Choose “No” next to “Do you label?” and the calculator leaves labeling out of both your current process and the Work Cell. Your savings then come from running with one operator and from the shorter time between sheets.
The example shop runs 2 people per machine with a 5.5-minute program cycle time, 4 minutes of labeling, 5 minutes to unload and load, an average rate of $25.25 an hour and 8 production hours a day. With a Model 43 Work Cell, its cost per sheet drops from $12.20 to $2.77, a savings of $9.43 per sheet, or about $78,000 a year based on its current 33.1 sheets a day, 250 days a year. The Work Cell can also run about 72.9 sheets a day in the same hours.
The Model 43 Work Cell is a complete nested-based CNC routing system on a 5'x10' table. It includes a 12 HP HSD spindle, a 21-position automatic tool changer, a full-table off-load rake with integrated dust collection, a powered 61"x144" out-feed conveyor and a remote operator station with a monitor and label printer. Options include a manual lift system and a next sheet locator light that shows the operator which stack to pull from.
Learn more about the Thermwood Model 43 and Model 43 Work Cell.